气动伸缩元件:请高手指教,谢谢

来源:百度文库 编辑:杭州交通信息网 时间:2024/04/28 11:58:13
as part of the facorty operating procedures the system should be set up if possible such that the ww sample scales and RR as a minimum are set up to automatically dump information to a PP based reporting system in a cut down LLLL type operating and reporting site network based system .but it is not considered that the facorty would require a full blown LLLL system

作为Facorty的操作程序制度应建立在这种可能,样品状态表和居民代表至少设置自动倾资料页的报告的基础上,系统的压缩式LLLL业务报告及现场网络系统.
但这并不认为facorty需要全面吹制LLLL

so hard.sorry